    What is Overall Equipment/Machine Efficiency (OEE):
    OEE is the framework for measuring the efficiency and effectiveness of a process, by breaking it down into three constituent components (Availability, Performance and Quality product rate). It helps to measure a problem so that easily can fix it and provides a standardized method of benchmarking progress. OEE identifies the percentage of planned production time that is truly productive.
    Overall Machine Efficiency

    Overall machine or equipment efficiency is the how to performs machine versus spec. In practically,

    OEE= Availability X Performance Rate X Quality Product Rate

    Where,

    Loading time – Down time
    Availability = ………………………………………. X 100
    Loading time

    Standard cycle time x Processing quantity
    Performance = …………………………………………………. x 100
    Operating time

    Processing quantity – Defective quantity
    Quality product rate = ……………………………………………………………. X 100
    Processing quantity

    Let,
    Working hours per day: 10 hours x 60 min = 600 min
    Shut down (SD): 35 min
    Loading time: (600-35) = 565 min
    Equipment stoppage/ down time: (30+20+25) = 75
    (a) Failure : 30 min
    (b) Set up : 20 min
    (c) Adjustment : 25 min
    Operating time : (565 – 75) = 490 min
    Standard Cycle time : 0.35 min/ pieces
    Processing quantity : 550 pieces/ day
    Defective : 30 pieces.
    Now,

    Loading time – Down time
    Availability = ……………………………………………. X 100
    Loading time

    565 – 75
    = ………………….. x 100
    565

    = 86.72%

    Standard cycle time x Processing quantity
    Performance = ………………………………………………….. x 100
    Operating time

    0.35 x 550
    = ……………………. X 100
    490

    = 40.35%

    Processing quantity – Defective quantity
    Quality product rate = ……………………………………………………………………. X 100
    Processing quantity

    550 – 30
    = …………….. x 100
    550

    = 94.54%

    So, OEE = Availability X Performance Rate X Quality Product Rate

    = 0.8672 X 0.4035 X 0.9454

    = 33.08%

    Low Machine efficiency rate due to man:
    Management Losses;
    Motion Losses;
    Adjustment Losses;
    Losses resulting from lack of automation and
    Monitoring Losses.